This posting has been archived
#600859
•
Posted 9/13/2021
Hike & Bike Trail Phase 1, Deer Park, TX
- Owner Reference
- 3790-19a
- Bid Date
- Oct 12, 2021 at 02:00pm
- Pre-Bid
- Mandatory - 9/29/2021 @ 11:00am @ (for location please or )
- Owner
- City of Deer Park TX
Description
Installation of new 6-8' wide decomposed granite trails, retaining walls, concrete ramps, and site furnishings with alternate trail lighting.
Construction includes but not limited to, excavation, SWPPP, drainage pipe installation, grading, base installation and compaction, granite trail installation, block wall installation, park amenity installation with required footings; and all other appurtenances necessary for the complete Project. The facility will be located at Tributary B to Willow Springs 1.04 Mile Trail that connects East
X Street to East P Street and connections to Tiffany Amber Park, Wynfield Park, and Running Brook Park by way of existing sidewalks. Bonds required.
Contact
- Charlie Sandberg
- (281) 478-2054
- [email protected]
CBS ID: 600859 | Published 9/13/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.