Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#600859 Posted 9/13/2021

Hike & Bike Trail Phase 1, Deer Park, TX

Owner Reference
3790-19a
Bid Date
Oct 12, 2021 at 02:00pm
Pre-Bid
Mandatory - 9/29/2021 @ 11:00am @ (for location please or )
Owner
City of Deer Park TX

Description

Installation of new 6-8' wide decomposed granite trails, retaining walls, concrete ramps, and site furnishings with alternate trail lighting. Construction includes but not limited to, excavation, SWPPP, drainage pipe installation, grading, base installation and compaction, granite trail installation, block wall installation, park amenity installation with required footings; and all other appurtenances necessary for the complete Project. The facility will be located at Tributary B to Willow Springs 1.04 Mile Trail that connects East X Street to East P Street and connections to Tiffany Amber Park, Wynfield Park, and Running Brook Park by way of existing sidewalks. Bonds required.

Contact

CBS ID: 600859 | Published 9/13/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.