This posting has been archived
#601210
•
Posted 9/16/2021
18-Inch Force Main Replacement along NE 135th St, North Miami, FL
- Owner Reference
- 59-20-21
- Bid Date
- Oct 29, 2021 at 03:30PM
- Pre-Bid
- Scheduled - 9/22/2021 @ 10:00am @ (for location please or )
- Owner
- City of North Miami FL
Description
The force main improvement project consists of the replacement of the existing 18-inch diameter force main along NE 135 St, between Biscayne Boulevard and NE 16th Avenue, with approximately 2,000 linear feet of 18-inch diameter and 100 linear feet of 10-inch DR-18 PVC force main including associated fittings, connections and reconnections, roadway restoration, sidewalk restoration, and curb and gutter restoration, as directed by the City and/or Engineer. Bonds Required. Prevailing Wages.
Contact
- Jean Joinville
- (305) 895-9886
- [email protected]
CBS ID: 601210 | Published 9/16/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.