This posting has been archived
#601262
•
Posted 9/16/2021
Eastridge Loop Road Repair, San Jose, CA
- Owner Reference
- C21132F
- Bid Date
- Sep 22, 2021 at 02:00pm
- Pre-Bid
- Encouraged - 9/8/2021 @ 10:00am @ (for location please or )
- Estimate
- $150K - $200K
- Owner
- Santa Clara Valley Transportation Authority
Description
Work consists of furnishing all labor, materials, tools, equipment services, supervision, and incidentals necessary to repair damaged concrete pavement at the Eastridge Transit Center. There are two areas that require repair: one at the entrance of Eastridge Loop, at Capitol Expressway, and one at the exit near Tully Road. Contractor will remove and replace the damaged concrete in the roadway and restripe the area that gets repaired. Bonds, Prevailing Wages. 4.84% DBE participation goal
Contact
- Ehab AzabEhab Azab
- (408) 232-1563
- (408) 955-9729
- [email protected]
CBS ID: 601262 | Published 9/16/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.