Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#601279 Posted 9/16/2021

New Construction: New GAC Pre-Treatment Facility, Hamilton, MA

Owner Reference
IFB2021-024
Bid Date
Oct 21, 2021 at 11:00am
Pre-Bid
Encouraged - 9/30/2021 @ 10:00am @ (for location please or )
Estimate
$2,700,000
Owner
Town of Hamilton MA

Description

The scope of work includes the construction of a new GAC pre-treatment facility to be installed adjacent to the existing Idlewood Wellfield Water Treatment Plant. The new facility will include a new pre-engineered metal building, concrete foundation, four (4) granular activated carbon adsorption vessels, process piping, instrumentation and control equipment, heating/ventilation, electrical systems, site preparation, connections to existing water main, and all appurtenant work. The work also includes demolition and alterations to the existing water treatment plant including the relocation and replacement of an existing louver with motorized damper, and connections to the plant’s existing backwash system piping. Sub bids will be received until October 7, 2021 at 11:00am. Sub trades include Masonry, Painting, HVAC, and Electrical. Bonds and prevailing wages

Contact

CBS ID: 601279 | Published 9/16/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.