This posting has been archived
New Construction: New GAC Pre-Treatment Facility, Hamilton, MA
- Owner Reference
- IFB2021-024
- Bid Date
- Oct 21, 2021 at 11:00am
- Pre-Bid
- Encouraged - 9/30/2021 @ 10:00am @ (for location please or )
- Estimate
- $2,700,000
- Owner
- Town of Hamilton MA
Description
The scope of work includes the construction of a new GAC pre-treatment facility to be installed adjacent to the existing Idlewood Wellfield Water Treatment Plant. The new facility will include a new pre-engineered metal building, concrete foundation, four (4) granular activated carbon adsorption vessels, process piping, instrumentation and control equipment, heating/ventilation, electrical systems, site preparation, connections to existing water main, and all appurtenant work. The work also includes demolition and alterations to the existing water treatment plant including the relocation and replacement of an existing louver with motorized damper, and connections to the plant’s existing backwash system piping. Sub bids will be received until October 7, 2021 at 11:00am. Sub trades include Masonry, Painting, HVAC, and Electrical. Bonds and prevailing wages
Contact
- Peter Caldarazzo
- (617) 531-0748
- [email protected]
CBS ID: 601279 | Published 9/16/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.