Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#601280 Posted 9/16/2021

Great Pond Road Stabilization, North Andover, MA

Bid Date
Oct 7, 2021 at 11:00am
Estimate
$620,000
Owner
Town of North Andover, MA

Description

The Work under this Contract includes, but is not limited to the installation of 280-linear feet of sheet pile to stabilize a roadway embankment, replacement of guardrail, the replacement of local drainage structures that includes a new manhole, piping, and headwall, stabilization of roadway embankment with riprap and boulder, paving, erosion controls, dewatering within a lake to install drainage headwall, and all appurtenances and incidental work necessary to complete the construction. Construction must be substantially complete 30 calendar days and final completion 60 calendar days from and including issuance of a notice to proceed, and/or receipt of fully executed contract. Bidder must hold a current MassDOT pre-qualification for the work limit required by MassDOT. Bonds and prevailing wages

Contact

CBS ID: 601280 | Published 9/16/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.