Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#601397 Posted 9/18/2021

Subcontractor Lead: Colorado River Aqueduct Cholla Wash Conduit Lining MM 126.55 to MM 126.74, Desert Center, CA

Owner Reference
2016
Bid Date
Oct 6, 2021 at 02:00pm
Pre-Bid
Mandatory - 9/16/2021 @ 09:00am @ (for location please or )
Estimate
$1,400,000 - $1,700,000
Owner
Metropolitan Water District of Southern CA at Los Angeles

Description

The work consists of lining approximately 1,000 linear feet of large horseshoe-shaped concrete conduit with epoxy pipe lining, surface preparation and repair prior to lining, temporary ventilation, and other appurtenant work as specified and shown on the figures. Bonds required. Prevailing wages apply.

Contact

CBS ID: 601397 | Published 9/18/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.