This posting has been archived
#601424
•
Posted 9/18/2021
458-1 Reservoir Interior / Exterior Coating & Upgrades, Chula Vista, CA
- Owner Reference
- FY22-3300-009
- Bid Date
- Sep 30, 2021 at 04:00pm
- Pre-Bid
- Scheduled - 9/20/2021 @ 09:00AM @ (for location please or )
- Estimate
- $795,500.00
- Owner
- Otay Water District
Description
The general scope of work includes the removal and replacement of the interior and exterior coatings on the 458-1 potable water welded steel tank. The 458-1 tank is located in Chula Vista, CA with a capacity of 0.8 MG. The work also includes structural modifications, including, but not limited to, interior roof rafter replacement, liquid level indicator replacement, cathodic anode replacement, new tank penetrations, new fall protection devices, and roof vent replacement, in accordance with the contract documents. Contract duration is 170 days. Contractor shall possess a valid Class A or C-33 license, including a SSPC QP-1, at the time of award. Bonds required. Prevailing wages apply.
Contact
- Kevin Cameron
- (619) 670-2248
- [email protected]
CBS ID: 601424 | Published 9/18/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.