This posting has been archived
#601474
•
Posted 9/19/2021
2020 Dead End Water Main Elimination Package II Project, San Antonio TX
- Owner Reference
- CO-00419-RL Job No. 20-7010
- Bid Date
- Oct 18, 2021 at 10:00am
- Pre-Bid
- Recommended - 9/22/2021 @ 10:00am @ (for location please or )
- Estimate
- $2,948,000
- Owner
- San Antonio Water System (SAWS), Contracting Office, TX
Description
Sealed bids are requested by the San Antonio Water System for the 2020 Dead End Water Main Elimination Package II Project, SAWS Job No. 20-7010, for the construction at the following 9 project sites:
• Hwy 16 and S. Zarzamora St: 2,216 LF of 8” DI water main and 245 LF of 16” DI water main by open cut method and 212 LF of 16” DI carrier pipe with 30” steel casing by boring method.
• Hwy 16 and Doolittle St: 2,567 LF of 8” HDPE water main by open-cut method.
• W. Mally Boulevard: 1,063 LF of 8” PVC C-900 water main by open-cut method.
• K St: 403 LF of 8” PVC C-900 water main by open-cut method and 116 LF of 8” PVC carrier
pipe with 24” steel casing by boring method.
• 6th St and Loop 1604: 366 LF of 8” PVC C-900 water main by open-cut method and 180 LF
of 8” PVC carrier pipe with 24” steel casing by boring method.
• Hwy 16 and Southern Trail: 389 LF of 8” PVC C-900 water main and 600 LF of 12” PVC C-900 water main by open-cut method and 189 LF of 12” PVC carrier pipe with 24” steel casing by boring method.
• Hwy 16 and Palo Alto Drive: 1,135 LF of 8” PVC C-900 water main and 259 LF of 12” PVC
C-900 water main by open-cut method.
• Toudouze: 407 LF of 12” HDPE water main by open cut method and 141 LF of 12” HDPE
carrier pipe with 24” steel casing (0.438-inch thickness) by boring method crossing roadway and
railroad right-of-way.
• Hume Road: 726 LF of 12” HDPE water main by open cut method and 128 LF of 12” HDPE carrier pipe with 24” steel casing (0.438-inch thickness) by boring method crossing railroad right-of-way.
Contact
- Roxanne Lockhart
- (210) 233-2335
- (210) 233-4438
- [email protected]
CBS ID: 601474 | Published 9/19/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.