Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#602009 Posted 9/23/2021

Cherrywood Dr & Division Ave Sidewalk Repair, Ormond Beach, FL

Owner Reference
FQ 2022-01
Bid Date
Oct 1, 2021 at 05:00PM
Owner
City of Ormond Beach FL

Description

Job Description & Scope: The 10’ wide sidewalk between Cherrywood Drive and Division Avenue has suffered multiple fractures and cracks that have become hazardous to pedestrians. The sidewalk has limited access and is obstructed to large vehicles by bollards. There are approximately 21 panels of the sidewalk that need to be replaced to mitigate the hazards. This comes to approximately 250 SY of replacement concrete. The existing sidewalk is 4” concrete. We are proposing 6”, 4000 PSI concrete for the replacement so that leisure services and maintenance vehicles can drive on the pavement. Bonds Required. Prevailing Wages.

Contact

CBS ID: 602009 | Published 9/23/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.