This posting has been archived
#602011
•
Posted 9/23/2021
Avenue F-1/4 Alignment and Jefferson Street Watermains, Somerton, AZ
- Owner Reference
- 2021-003
- Bid Date
- Oct 7, 2021 at 02:00pm
- Pre-Bid
- Encouraged - 9/30/2021 @ 02:00pm @ (for location please or )
- Owner
- City of Somerton, AZ
Description
The proposed work is located along Avenue F-1/4 alignment from Main Street to Jefferson Street and along Jefferson Street from Avenue F-1/4 alignment to Cesar Chavez Avenue (Avenue F) within the limits of the City of Somerton, Arizona. The work consists of, but is not limited to installation of 2,680 linear feet of 12” diameter watermain, 1,305 linear feet of 10” diameter watermain, miscellaneous 6” and 8” diameter watermain laterals, including fire hydrants, 1” and 2” water services, pipe fittings and concrete thrust blocks. Work will be performed per specifications in the Contract Documents and Project Plans. Work must start within 10 calendar days after the date of commencement established by the Notice to Proceed and must be completed and suitable for use within 90 Calendar Days after such commencement date. Bonds and prevailing wages.
Contact
- Samuel Palacios
- (928) 722-7371
- [email protected]
CBS ID: 602011 | Published 9/23/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.