New Green River Maintenance Facility, Green River UT
- Owner Reference
- 21018900
- Bid Date
- Dec 2, 2021 at 04:00PM
- Pre-Bid
- Mandatory - 10/4/2021 @ 09:00am @ (for location please or )
- Estimate
- $5.8 Million
- Owner
- State of Utah Division of Facilities Construction & Management, DFCM UT
- Trades
- General Engineering Contractor GEC, General Contractor GC
Description
New construction: This design-bid-build project includes construction services for a new approximately 15,500 GSF maintenance complex that includes, but is not limited to a maintenance bay, storage bay, materials lab, offices, restroom, break room, wash room, sander rack, dumpster enclosure, and associated site work (asphalt paving, entry gates, perimeter fencing, etc.). The work of the project also includes, but is not limited to demolition of existing buildings (approximately 10,000 GSF), existing sander racks, existing site asphalt, some existing fence, and other landscape items. The Management Plan and Statement of Qualifications must be submitted to DFCM via email no later than 12:00 Noon on Tuesday, October 19, 2021. Submittals received after the specified time will not be accepted. DO NOT SUBMIT VIA U3P. Bonds equired.
Contact
- Matthias Mueller
- (801) 538-3018
- (801) 538-3267
- [email protected]
CBS ID: 602097 | Published 9/24/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.