Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#602106 • Posted 9/24/2021

DSU High Voltage Loop Upgrades Phase II, St. George UT

Owner Reference
22092640
Bid Date
Oct 26, 2021 at 11:59am
Pre-Bid
Mandatory - 10/5/2021 @ 11:00am @ (for location please or )
Owner
Dixie State University

Description

The second phase of an upgrade to the north campus medium voltage loop including, but not limited to, the replacement of: VFIs, sectionalizers, conductors, junctions, terminations, vaults, ground sleeves, etc. as per the project Plans & Specifications prepared by Spectrum Engineers. Bonds required. Electrical contractors shall have experience with similar sized medium-voltage (15 kV class) cabling and equipment installation. This experience must include at least 5 similar projects during the past 7 years, In addition, the installer engaged to perform cable splicing and terminations shall be trained and certified by the splice material manufacturer, to install, splice, and terminate medium voltage cables. Cable splices and terminations shall be made only by qualified cable splicers in strict accordance with the recommendations of the Engineer that each cable splicer has worked as a journeyman in his trade for the past 10 years, continuously. A list of jobs, types of cable and voltage levels worked on during this period and manufacturer’s training certificates must be supplied as the required evidence.

Contact

CBS ID: 602106 | Published 9/24/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.