This posting has been archived
#602138
•
Posted 9/24/2021
New Construction: Utley Creek Greenway Connection, Holly Springs NC
- Owner Reference
- TOHS #14-021
- Bid Date
- Oct 13, 2021 at 02:00pm
- Pre-Bid
- Scheduled - 9/30/2021 @ 09:00am @ (for location please or )
- Owner
- Town of Holly Springs NC
Description
UTLEY CREEK GREENWAY CONNECTION – The project generally includes 1,500 linear feet of new 10’ wide asphalt trail construction (10-foot wide asphalt, 2 foot shoulders), 100 linear feet of prefabricated steel bridge construction (2 @ 50 feet), associated clearing, drainage, erosion control, signage and approximately 1,350 linear feet of repair and repaving of existing asphalt trail. Location Ballentine between Ballenridge/Avent Acres Sub-divisions, crossing 55. Bonds required.
Contact
- Matt Beard
- (919) 567-4018
- [email protected]
CBS ID: 602138 | Published 9/24/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.