This posting has been archived
#602161
•
Posted 9/24/2021
Remove & Replace Roof at Main Hall, Havelock NC
- Owner Reference
- 091321
- Bid Date
- Oct 6, 2021 at 03:00pm
- Owner
- City of Havelock, NC
Description
Requesting bid for removal of existing cover and installation of new roof facing
material over existing roof installation in Main Hall (approximately 7,200 SF).
Provide all supervision, labor, material, equipment, and incidentals for the work
described below: Remove and dispose of old cover in accordance with state and local
regulations. Existing insulation to remain in place and intact; Install approximately 7,200 SF of white Lamtec WMP-RETRO or equivalent facing material over existing roof insulation. Eave height is approx. 20’-4” above slab and Ridge height is approx. 29’-6” above slab; Clean up and remove all construction related debris from site daily; Provide 1 year labor and manufacturer’s material warranty.
Contact
- Lee Tillman
- (252) 444-6400
- (252) 447-0126
- [email protected]
CBS ID: 602161 | Published 9/24/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.