Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#602166 Posted 9/24/2021

TGOW "Tall Glass of Water": Phase I Construction: Sandy Beach and Bluffs, Merry Hill, NC

Owner Reference
090820211
Bid Date
Oct 22, 2021 at 01:00pm
Pre-Bid
Mandatory - 9/27/2021 @ 01:00pm @ (for location please or )
Owner
County of Bertie NC

Description

Referred to locally as "Tall Glass of Water" (TGOW)" until a name and logo have been selected, the site's most stunning feature is its 2,200 linear feet of sand beach and shallow calm waters overlooked by impressive high cliffs on the Albemarle Sound where the Chowan River begins. Complete scope of work is in the bid documents; ADA Ramp, walkway to the beach and parking; Restrooms, outdoor showers, water bottle refill stations, kayak storage kiosk; Picnic Pavilion with 8 picnic tables made by Bertie High School Shop Class; 2 miles hiking trail; Primitive Camping; Restored meadow area. The County desires a nature-based solution for reducing bluff erosion while maintaining the sandy beach. The three-pronged approach includes: 1) a line of non-pressure treated breakwaters to temporarily protect cypress saplings while they become established. The cypress trees will then provide shoreline protection by creating thin but effective sand bars that extend out from the sandy beach called tombolos. This is not necessary at the main swim beach because cypress and tombolos already exist. 2) At the base of the bluff natural fiber material arranged in a roll, called coir logs, will be used to protect another line of cypress saplings. 3) At the top of the bluff natural vegetation will be planted to stabilize the upper portion. The goal is to retain moisture within the exposed soil, develop a strong root system and create a natural buffer line along the shore that reduces the day-to-day wave action. Bonds Required.

Contact

CBS ID: 602166 | Published 9/24/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.