Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#602267 Posted 9/26/2021

Quarter Circle Drive Canal Piping Project-2021, Nibley UT

Bid Date
Oct 13, 2021 at 01:00PM
Pre-Bid
Strongly Recommended - 9/29/2021 @ 01:00PM @ (for location please or )
Owner
Nibley Blacksmith Fork Irrigation Company (NBSFIC)

Description

The Quarter Circle Drive Canal Piping Project consists of installing approximately 2,200 feet of 42” HDPE DR 32.5 pipe within an existing irrigation ditch. Additionally, a headworks structure will be built at the origin of the pipe and a discharge headworks structure will be built at the termination point of the pipe. There are no road crossings to be completed. This project is located in Nibley, Utah and starts near the intersection of US 165 and Quarter Circle Drive and ends near the intersection of 250 West and Quarter Circle Drive. The canal does run along several back yards in a residential area and will require tree. This project is funded by US Bureau of Reclamation, Utah Division of Water Resources, Utah State Agriculture Department and Nibley Blacksmith Fork Irrigation Company removal and vegetation clear and grubbing. Project is to be completed by March 15, 2022 and substantially completed by March 1st, 2022. A winter shut down will be expected.

Bonds required.

Contact

  • (435) 752-3802

CBS ID: 602267 | Published 9/26/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.