Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#602405 Posted 9/27/2021

Scott Boulevard Phase II Watermain Replacement, DeKalb County, GA

Owner Reference
21-101332
Bid Date
Nov 15, 2021 at 03:00pm
Pre-Bid
Mandatory - 10/4/2021 @ 01:00pm @ (for location please or )
Owner
County of DeKalb GA

Description

The scope of work for this project consists of installation of 30-inch DIP Watermain and replacement of existing 8-inch distribution mains with 12” DIP inside the right-of-way and under the existing pavement. The existing 30” steel watermain and some of the 8-inch distribution mains will be abandoned in place and filled with non-shrink grout. Components also include the replacement and installation of 12-inch DIP Water main inside the right-of-way to run parallel to the 30-inch main with interconnections at specified locations. Mandatory DeKalb First LSBE Meeting: (Bidders must attend 1 meeting on either of the dates listed.) September 29, 2021 and October 6, 2021 (Meetings are held at 10:00 a.m. and 2:00 p.m.) Video Conference: Utilize the link supplied on DeKalb County webpage labeled “DeKalb First LSBE Video Meeting”.

Bonds required.

Contact

CBS ID: 602405 | Published 9/27/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.