Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#602462 Posted 9/28/2021

Wastewater Pond Site Cutting, Cleaning and Vegetation Removal 73 Greenwood Lane, Dillard, GA

Owner Reference
21-003
Bid Date
Oct 28, 2021 at 02:00pm
Owner
City of Dillard

Description

I. Cutting and Cleaning a. Grass and beneficial vegetation on the site should be cut to between 4 and 6 inches and the clippings/trimmings should be removed from the pond site and properly disposed of. b. The vegetation, trees, brush and grass shall be cut and or pulled from the concrete embankment apron along the entire perimeter of the pond. All debris and trimmings should be removed from the pond site and properly disposed of. c. All brush, trees, grassy plants, vines and trees shall be removed from the interior of the pond including overgrowth around the concrete outlet structure and walkway. All debris should be removed from the pond site and properly disposed of. d. All vines and tall grassy plants shall be removed from all buildings, structures, fences and gates. All debris should be removed from the pond site and properly disposed of. e. All pipes, cables, wires and other facilities in and around the pond shall not be damaged. f. Should the concrete pond apron be damaged when removing vegetation, the concrete shall be patched in like kind. g. Repair undercut, holes or eroded areas by applying soil, seed and straw to said areas. I. Spraying a. Spray the pond concrete apron in the areas when vegetation was removed with approved herbicide. b. Spraying should be done after the vegetation is cut, not before. c. A 1’ buffer area around the pond fence line should also be sprayed. The 1’ begins 6” from the fence. III. Property Damage a. Ensure that there is no damage to the property driveway, walkway, grass, or any pipes, cables, wires baffles in and around the facility. If there is damage it must be replaced with the exact same type of material at your expense. Contact City Hall if you need help with determining the best way to access the pond without damaging property. IV. Finishing a. Remove dirt, trash, silt, removed vegetation and any other kind of yard debris from the pond site. b. Landscape, seed and straw in and around the pond site as needed. Site visits may be scheduled 48 hours in advance by contacting City Hall at (706) 746-5891. All questions are due to Glenda Enloe, City Clerk via email at [email protected] on or before 12:00 p.m. local time on Thursday, October 22, 2021. Insurance requirements.

Contact

CBS ID: 602462 | Published 9/28/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.