This posting has been archived
Mulberry River Stream Restoration Project, Braselton, GA
- Bid Date
- Nov 4, 2021 at 10:00am
- Pre-Bid
- Mandatory - 10/14/2021 @ 02:00pm @ (for location please or )
- Owner
- Town Of Braselton GA
Description
The Project consists of, but is not limited to the following major elements: Stabilize the banks of the Mulberry River by creating a more stable pattern and profile. This will be accomplished by modifying the existing stream channel and constructing Bankful Benches, Toe Wood, Rock J Hooks and Low Flow Deflectors to reduce the shear stress on the banks of the River. Approximately 32,000 Cubic Yards of material will be removed and deposited on adjacent lands. Questions can be submitted by phone or email. Insurance requirements.
Bonds required.
Contact
- Ken Peters
- (770) 962-1387
- [email protected]
CBS ID: 602464 | Published 9/28/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.