Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#602522 Posted 9/28/2021

Mason Farm WWTP Fermenter Mixing Equipment Installation Project. Chapel Hill NC

Owner Reference
27878-01
Bid Date
Oct 22, 2021 at 02:00pm
Pre-Bid
Mandatory - 10/6/2021 @ 03:00pm @ (for location please or )
Owner
County of Orange Water and Sewer Authority (OWASA) NC

Description

The Project consists of furnishing all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete and operable installation of 1. Demolition of existing pipe and mixing headers and their associated structural supports inside the fermenter tank up to wall pipe connections. 2. Demolition of two submersible pumps and associated piping up to wall the fermenter wall pipes in the basement of the Old Digester Control Building. 3. Excavation and demolition of underground fermenter gas condensate pipe, including its associated drip trap in the basement of the Old Digester Building. 4. Optional removal and reinstallation of a 6-foot by 6-foot section of the concrete cover for the fermenter tank to provide easier access to the interior of the fermenter. This would include the associated PVC liner repair. 5. Installation of new mixing nozzles and associated pipe and supports in the fermenter tank. This includes spot repairs to the existing PVC liner as required. 6. Installation of a vertically mounted centrifugal chopper pump in the basement vault of the Old Digester Control Building, as well as required structural modifications to fit the new pump in the vault. 7. Installation of new pipe, valves and supports in the basement of the Old Digester Control Building. 8. Installation of new gas condensate accumulator and associated drain and vent piping improvements. 9. Repair and coating of corroded sampling hatches in the fermenter cover. 10. Electrical improvements for power and controls of new equipment. 11. Installation of new level and flow instruments and integration of new controls with the plant-wide SCADA system, as defined in the CITI scope of supply (Appendix C). 12. Inspection of Fermenter Tank as described in Specification Section 03 01 00. 13. And all associated appurtenances as described in the Specifications and as shown on the Drawings.

Bonds required.

Contact

CBS ID: 602522 | Published 9/28/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.