This posting has been archived
#602567
•
Posted 9/28/2021
Bridge Structure Replacement Project (37 & 88), Raleigh NC
- Owner Reference
- PR-Bridges37-88-0615R2
- Bid Date
- Oct 25, 2021 at 01:00pm
- Pre-Bid
- Scheduled - 10/4/2021 @ 01:00pm @ (for location please or )
- Owner
- City of Raleigh NC
Description
The Project consists generally of the following major items:
Bridge Project 37 consists of replacing the existing timber pedestrian bridge structure with
a 12-foot wide prefabricated steel pedestrian structure within the proximity of the existing
structure. Bridge Project 88 consists of replacing the existing timber pedestrian bridge structure with
a steel and concrete bridge that has a clear 10 ft. deck width.
MWBE Goals
Contact
- Jacob Ray
- (919) 695-6051
- [email protected]
CBS ID: 602567 | Published 9/28/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.