This posting has been archived
#602568
•
Posted 9/28/2021
Wilders Grove Stream Restoration, Raleigh NC
- Owner Reference
- SWS-WG0821-1R
- Bid Date
- Oct 28, 2021 at 10:00am
- Owner
- City of Raleigh NC
Description
The Project consists generally of the following major items:
1. Replacement of two culverts, a. The upstream 60” corrugated metal pipe (CMP) will be replaced with one
60” corrugated aluminum alloy pipe (CAAP) and two 36” floodplain CAAPs. b. The downstream 48” high density polyethylene (HDPE) pipe will be replaced
with one 60” CAAP and two 36” floodplain CAAPs. 2. Priority 1 stream restoration through the Upper Reach, which includes replacing the existing incised stream with an excavated Rosgen Type C stream channel
connected to the historic floodplain. 3. Priority 3 stream restoration through the Lower Reach with the objective of widening the available floodplain while keeping the stream bed near the existing elevation.
4. Significant elevation change is required in the Middle Reach in order to connect the Priority 1 Upper Reach to the Priority 3 Lower Reach. Constructed riffles, a boulder steppool sequence, and a more pronounced series of boulder grade control structures will be installed in the Middle Reach to provide a stable stream bed and necessary grade control. 5. Native vegetation will be established within and adjacent to the proposed stream. MWBE Goals.
Contact
- Meagan Tosches
- (919) 906-9737
- [email protected]
CBS ID: 602568 | Published 9/28/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.