This posting has been archived
Transmission Main Replacements Project, East Wenatchee, WA
- Bid Date
- Oct 19, 2021 at 10:00AM
- Owner
- East Wenatchee Water District
Description
Work to be performed includes: installation of approx 2,999 ft of 12-inch ductile iron pipe, 2,000 ft of 20-inch fusion welded HDPE pipe, 2,000 ft of 22-inch fusion welded HDPE pipe and related valves, appurtenances, and connections to the existing systems.
Bonds required. Prevailing wages.
Contact
- Paul Young
- (509) 886-6794
- [email protected]
CBS ID: 602633 | Published 9/29/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.