This posting has been archived
Smith Barnes Sewer Basin Rehabilitation- Phase II, Stockbridge, GA
- Owner Reference
- 2021-0012
- Bid Date
- Dec 2, 2021 at 03:00pm
- Pre-Bid
- Recommended - 10/14/2021 @ 10:00am @ (for location please or )
- Owner
- City of Stockbridge GA
- Trades
- General Engineering Contractor GEC, Pipeline Contractor: Wastewater, Water Mains & Sewer Systems, May Include Camera Inspections
Description
The work to be completed shall consist of furnishing all labor, equipment, and material necessary to install approximately 1,650 LF of 8” and 10" DIP/PVC and FPVC Sewer by open-cut, 900 LF cured-in- place lining, 100LF jack and bore, four (4) new manholes and rehabilitation of eleven (11) manholes complete with bypass pumping, roadway replacement, earthwork, grassing, soil erosion and sediment control measures, and appurtenances Necessary to provide a complete installation in accordance with the Contract Documents. Attention is called to the fact that this project is being funded fully or partially through the Community Development Block Grant (CDBG) Program of the U.S. Department of Housing and Urban Development. The bidder is asked to pay special attention to the Federal Regulations are found in “Part I - Bidding / Agreements / Bonds / Conditions; Section XVI - Federal CDBG Construction Exhibits” contained in this bid package. Questions due 12:00 PM, Friday, November 12, 2021.
Bonds required.
Contact
- Lindell Miller
- (678) 833-3322
- (770) 389-7912
- [email protected]
CBS ID: 602672 | Published 9/29/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.