Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#602699 Posted 9/29/2021

Central Avenue Pump Station, Rye, NY

Owner Reference
2021-06
Bid Date
Oct 13, 2021 at 10:00am
Owner
City of Rye NY

Description

The Work includes labor, material and equipment, services required for construction, testing, and commissioning of the Project in accordance with the Contract Documents and as more specifically described in the Specifications and Drawings and includes, but is not limited to, the following principal features: Installation of a new gravity sewer, force main sewer and manholes, and laterals in the City of Rye. Installation of one (1) Packaged Pump System. Installation of new system controls for the pump station. New electrical and natural gas service for the pump station, including emergency backup generators. Connection from the pump station to an existing gravity sewer manhole. The work site locations, existing site conditions and site data is as shown on the Drawings. Additional details and coordination items are as shown in Article 1 in the Summary of Work. The Work shall be substantially complete within 180 calendar days from the commencement of Contract Time and completed and ready for final payment 210 calendar days from the commencement of Contract Time. 

Bonds required. Prevailing wages.

Contact

CBS ID: 602699 | Published 9/29/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.