This posting has been archived
Dinmore Road WWTP and Rockefeller Road Pump Station Bar Screen Replacement Contracts 1G and 1E, Selkirk and Delmar, NY
- Bid Date
- Nov 16, 2021 at 02:00pm
- Owner
- Town of Bethlehem NY
Description
The work includes providing all labor, materials, tools, equipment and other means of construction necessary and incidental to the completion to the work shown on the drawings and described in these specifications including, but not necessarily limited to, the following: removal and properdisposal of existing bar screens, belt conveyors, and associated electrical and controls components. Installation of new continous belt bar screens, washer compactors, and belt conveyors includin associated controls. Miscellaneous water and drain piping required for operation of equipment. Modifications to the existing channel to facilitate installation of new screens. Electrical wiring and controls to tie new equipment into the Town's existing system.
Contact
- Matthew Hoffman
- (518) 439-4955
- [email protected]
CBS ID: 602910 | Published 10/1/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.