This posting has been archived
William Cannon Drive, Phase 3 Project, Travis Co., TX
- Owner Reference
- BCE19001
- Bid Date
- Nov 4, 2021 at 10:00AM
- Pre-Bid
- Mandatory - 10/13/2021 @ 10:00am @ (for location please or )
- Owner
- Carma Easton LLC, TX
Description
Carma Easton is soliciting this arterial road construction project on behalf of Travis County and Pilot Knob MUD 1. The work, in general, consists of the construction of an arterial road and associated infrastructure including grading, roadway, bridge, storm sewer, water quality, landscaping, sidewalks, and erosion controls. The Project is located at a starting point of Cardinal Bloom Loop (approximately 1520 feet east of the intersection of William Cannon Drive and McKinney Falls Parkway) and extending east approximately 1 ¾ -mi. to the stub-out of the west bound lanes constructed under William Cannon Drive Phase 2 (approximately 400 feet west of U.S. Highway 183) in Travis County, Texas. Contract Time is of the essence and all Work shall be substantially complete within 365 Calendar Days. HSP required.
Bonds required. Prevailing wages.
Contact
- Randy Nelson
- (512) 758-7474
- [email protected]
CBS ID: 603016 | Published 10/3/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.