This posting has been archived
Construction of the Northport 24" Force Main on Glades Cutoff Rd, Port St. Lucie, FL
- Owner Reference
- 20210016
- Bid Date
- Nov 1, 2021 at 03:00PM
- Pre-Bid
- Scheduled - 10/7/2021 @ 10:00am @ (for location please or )
- Owner
- Port of St. Lucie FL
Description
New Construction: The Northport 24” Force Main Project on Glades Cutoff Road in Port St. Lucie consists of a 24” force main that starts at Glades Cutoff Road south of Midway Road near Canal 105. From there it will proceed south to connect with an existing 24” force main on Glades Cutoff Road at the intersection with Commerce Centre Parkway. The project includes approximately 8,240 linear feet of 24” main, two 24” x 16” stub-outs for future connections, a 24” x 24” stub-out for a future connection, 24” line stops, 24” tapping sleeve and valve, 24” plug valves, air release valves, piping fittings, replacement of sidewalks, roads and restoration of sod, and all other necessary appurtenances. It also includes a directional bore of 1,790 linear feet under Interstate Highway I-95.
Bonds required. Prevailing wages.
Contact
- Shelby Dolan
- (772) 344-4068
CBS ID: 603063 | Published 10/4/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.