This posting has been archived
Runway 18L-36R Asphalt Keel Reconstruction, Jacksonville, FL
- Owner Reference
- C-867
- Bid Date
- Nov 2, 2021 at 03:00PM
- Pre-Bid
- Scheduled - 10/12/2021 @ 10:00am @ (for location please or )
- Owner
- Jacksonville Aviation Authority
Description
This project can be generally described as the asphalt reconstruction of the center 50-foot wide by 500-foot long keel section on the northernmost end of Runway 18L-36R. The Runway is 12,504 feet long and 200 feet wide. The project is adjacent to the Portland Cement Concrete (PCC) Pavement of Runway 18L, extending for 500 South of this PCC/Asphalt Pavement interface. This project will consist of the complete removal and reconstruction of the asphalt pavement in the center 50-foot width of this section. The keel replacement provides the reconstruction of the central and most critical portion of the Runway used by the design aircrafts main gears. This allows the Runway to properly serve the airport for at least another 20 years. The affected Runway 18L-36R centerline pavement markings within the project limits will be replaced, as-is. DBE goal of 6%.
Bonds required. Prevailing wages.
Contact
- Sue Finney
- (407) 599-1122
- [email protected]
CBS ID: 603080 | Published 10/4/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.