This posting has been archived
RFQ E Harmony (WCR74) - Weld County Road 19 Intersection Improvements, Severance CO
- Owner Reference
- 2021-601
- Bid Date
- Nov 5, 2021 at 05:00PM
- Pre-Bid
- Mandatory - 10/12/2021 @ 02:00PM @ (for location please or )
- Owner
- Town of Severance, Colorado
Description
The project will include the preparation of an Intersection Control Analysis (ICA) for a signalized intersection and a roundabout configuration. The intersection control analysis will be presented to the Town Council with a memorandum prepared by Town staff and the CE. Following a determination, the CE will proceed with existing conditions investigation and assessment, horizontal layout, vertical design, signing and pavement markings, traffic signal (or roundabout) design, drainage assessment and design, construction drawings, and bidding documents. The services provided by the selected consultant/consultant team will include the civil engineering/roadway design, surveying, utility relocation design (if required), traffic engineering, and geotechnical engineering. The utility locates, topographic survey, and geotechnical engineering can commence when the Contract is executed.
Contact
- Mitch Nelson
- (970) 685-7964
- [email protected]
CBS ID: 603081 | Published 10/4/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.