This posting has been archived
RFP Construction Management, Inspection, Materials Testing, Fryer Creek Pedestrian and Bicycle Bridge, Sonoma CA
- Owner Reference
- 1802 - FED Project CML-5114(020)
- Bid Date
- Nov 1, 2021 at 03:00PM
- Owner
- City Of Sonoma
Description
The improvements generally consist of street and Class I pathway improvements, including installation of pre-engineered and pre-fabricated clear span steel truss pedestrian bridge, concrete bridge abutments and work at each approach to the new bridge, including new signage, striping and pavement markings, removal and replacement of existing curb and gutter, construction of new HMA pavement section, HMA overlay and grinding, concrete sidewalk, driveway and pathway, new ADA curb ramps and upgrading existing curb ramps for ADA compliance, tree removal, new street light, traffic control and other related work. DBE goal is 8%.
Bonds required. Prevailing wages.
Contact
- (707) 938-3681
- (707) 938-8775
- [email protected]
CBS ID: 603319 | Published 10/6/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.