This posting has been archived
SMART Overlay, ADA improvements US 12-20-41, Chicago, IL
- Owner Reference
- 62M19
- Bid Date
- Nov 5, 2021 at 12:00pm
- Owner
- State of Illinois Department of Transportation (ILDOT) IL
Description
This is a SMART resurfacing project with ADA sidewalk improvements, pavement patching, and crack and joint sealing. The work to be performed under this contract consists of HMA surface removal, HMA and PCC pavement patching, concrete curb and gutter removal and replacement, sidewalk removal, PCC sidewalk replacement, resurfacing with hot-mix asphalt surface course, crack and joint sealing, placement of thermoplastic and modified urethane pavement markings, and all incidental and collateral work necessary to complete the project as shown on the plans and as described herein. DBE goal for this project is 19%. EEO requirements.
Prevailing wages.
Contact
- ILDOT
- (800) 452-4368
- [email protected]
CBS ID: 603327 | Published 10/6/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.