This posting has been archived
Cactus Middle School Weatherization, Casa Grande, AZ
- Owner Reference
- 202-1121
- Bid Date
- Nov 5, 2021 at 10:30am
- Pre-Bid
- Strongly Recommended - 10/13/2021 @ 10:30am @ (for location please or )
- Owner
- Casa Grande Elementary School District
Description
The purpose of this Bid is to contract with a qualified Firm/Contractor to Weatherize Cactus Middle School to prevent further interior and exterior damage to the building. This project’s scope of work involves, but is not limited to, the following: Removal and replacement of all exterior sealants at control joints, expansion joints, joints at building perimeter, and joints between dissimilar materials, such as hollow metal door and window frames to block. Repairs of cracks, holes and voids in existing exterior concrete masonry unit, brick, and stucco walls, including blocks, grout joints, and cavities at the top of parapets. Application of block filler and elastomeric water repellant coating on all exterior building walls, including the inside face of parapets above roofs. Removal and replacement of select areas of exterior gypsum board soffits. Painting of exterior metals, including doors and frames and steel canopies. Fabrication and installation of tube steel downspout boots. Minor grading work at building perimeter to improve from of water away from buildings. Deadline for questions is October 20, 2021 by 12:00pm.
Bonds required.
Contact
- Dennis York
- (520) 876-3204
- [email protected]
CBS ID: 603415 | Published 10/7/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.