Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#603639 Posted 10/8/2021

Terminal 2 East Electrical Modernization, San Diego, CA

Owner Reference
412347FC
Bid Date
Nov 3, 2021 at 02:00pm
Pre-Bid
Scheduled - 10/12/2021 @ 02:00PM @ (for location please or )
Estimate
$4,900,000.00
Owner
County of San Diego Regional Airport Authority CA

Description

The work consists of, but not limited to the following: 1. Modernize electrical power feeding Terminal T2E, per the following: • Replace existing outdoor Main Switchboard (MSB), and associated main control panel and downstream electrical equipment • Provide new MSB with Main-Tie-Main functionality • Provide new redundant 12kV transformer • Construct new larger and modernized main electrical room 2. Construct a new modernized ATO breakroom, based on the following: • Assist the Authority to relocate furniture and appliances out of the existing ATO breakroom • Construct new ATO breakroom and kitchen facilities • Provide new kitchen cabinets, appliances, and furniture 3. Perform the Work in such a way as to support airport operations at all times. Provide temporary power and support contingencies as needed to ensure uninterrupted power to Airport facilities in case of planned and unplanned power interruptions. Questions are due no later than 2:00 PM on Oct 19th. 

Bonds required. Prevailing wages.

Contact

CBS ID: 603639 | Published 10/8/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.