Terminal 2 East Electrical Modernization, San Diego, CA
- Owner Reference
- 412347FC
- Bid Date
- Nov 3, 2021 at 02:00pm
- Pre-Bid
- Scheduled - 10/12/2021 @ 02:00PM @ (for location please or )
- Estimate
- $4,900,000.00
- Owner
- County of San Diego Regional Airport Authority CA
Description
The work consists of, but not limited to the following: 1. Modernize electrical power feeding Terminal T2E, per the following: • Replace existing outdoor Main Switchboard (MSB), and associated main control panel and downstream electrical equipment • Provide new MSB with Main-Tie-Main functionality • Provide new redundant 12kV transformer • Construct new larger and modernized main electrical room 2. Construct a new modernized ATO breakroom, based on the following: • Assist the Authority to relocate furniture and appliances out of the existing ATO breakroom • Construct new ATO breakroom and kitchen facilities • Provide new kitchen cabinets, appliances, and furniture 3. Perform the Work in such a way as to support airport operations at all times. Provide temporary power and support contingencies as needed to ensure uninterrupted power to Airport facilities in case of planned and unplanned power interruptions. Questions are due no later than 2:00 PM on Oct 19th.
Bonds required. Prevailing wages.
Contact
- Erica Lopez
- (619) 400-2540
- [email protected]
CBS ID: 603639 | Published 10/8/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.