This posting has been archived
Main Street Phase 2 Improvements, Tigard, OR
- Owner Reference
- CIP 2022 – 97017, Proj 2022-08
- Bid Date
- Nov 10, 2021 at 02:00pm
- Owner
- City of Tigard OR
Description
The project generally consists of the following: 1. Reconstructing the existing street with treated subgrade and asphalt concrete pavement 2. Constructing ADA curb ramps, crosswalks, and pedestrian facilities 3. Installation of water and stormwater, with appurtenances 4. Installation and planting of green stormwater facilities 5. Installation of lighting, signage, pavement markings, and other miscellaneous improvements 6. Performance of additional and incidental work Insurance required.
Bonds required. Prevailing wages.
Contact
- Purchasing Department
- (503) 639-4171
- [email protected]
CBS ID: 603681 | Published 10/9/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.