This posting has been archived
Channelization Improvements, Traffic Signal Modernization, Drainage Improvements, Retaining Walls, Culvert Rehabilitation, and Modifications to Lighting, Cook, Hodgkins, and Countryside., IL
- Owner Reference
- 62C25
- Bid Date
- Nov 5, 2021 at 12:00pm
- Owner
- State of Illinois Department of Transportation (ILDOT) IL
Description
The work to be performed under this Contract shall consist of pavement removal, earth excavation, placement of furnished excavation, sidewalk reconstruction, shared use path construction, construction of new PACE bus pads, ADA ramp construction, roadway reconstruction and resurfacing, roadway widening, channelization improvements, concrete median construction, placement of pavement markings, concrete repair of four culverts, construction of two retaining walls, traffic signal modernization at three intersections with interconnect to an existing fiber optic system, lighting improvements, drainage improvements, and all incidental and collateral work necessary to complete the project as shown in the plans and described herein. DBE goal for this project is 21%. EEO requirements.
Bonds required. Prevailing wages.
Contact
- ILDOT
- (800) 452-4368
- [email protected]
CBS ID: 603796 | Published 10/11/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.