This posting has been archived
Channelization project on Illinois Route 50 Includes Standard Overlay, Traffic Signal Installation, and Lighting Installation, Villages of University Park and Richton Park, IL
- Owner Reference
- 62F87
- Bid Date
- Nov 5, 2021 at 12:00pm
- Owner
- State of Illinois Department of Transportation (ILDOT) IL
Description
This is a channelization and traffic signal installation project and the work to be performed under this contract consists of traffic signal installation, lighting installation, pavement widening, resurfacing with hot-mix asphalt surface and binder courses, detector loop installation, drainage pipes and structure installation, placement of thermoplastic pavement markings, and all incidental and collateral work necessary to complete the project as shown on the plans and as described herein. DBE goal for this project is 17%. EEO requirements.
Bonds required. Prevailing wages.
Contact
- ILDOT
- (800) 452-4368
- [email protected]
CBS ID: 603797 | Published 10/11/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.