Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#603799 Posted 10/11/2021

Sunrise Meadows Bike Park, Saratoga Springs UT

Bid Date
Oct 28, 2021 at 03:00PM
Pre-Bid
Mandatory - 10/14/2021 @ 02:00PM @ (for location please or )
Estimate
$485,605
Owner
City Of Saratoga Springs Utah

Description

Major quantities of work are as follows:
• Approximately 1750 feet of asphalt and concrete trails.
• Landscaping, irrigation, and concrete pads with pavilions alongside of trails.
• Pump track inside of existing detention basin.
• Drainage upgrades to the existing detention basin.
• Coordination with Welby Jacob Water Users Company and Hansen, Allen and Luce, Inc. respective with the Welby Jacob canal.
• Bid alternate includes mountain bike trails.
Contractors must bid all Alternates associated with the Schedule(s) being bid.

Contractor must use one of the two pre-approved companies for the Mountain Bike Trail and Pump Track:

1. American Ramp Company
2. PumpTrax USA

120 working days duration.

Bonds required. Prevailing wages.

Contact

CBS ID: 603799 | Published 10/11/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.