1800 North Sewer Realignment, Phase 1 – Inverted Siphon, Salt Lake City UT
- Owner Reference
- 525002878
- Bid Date
- Nov 19, 2021 at 02:00pm
- Pre-Bid
- Mandatory - 10/20/2021 @ 10:00am @ (for location please or )
- Estimate
- $7,405,389
- Owner
- Salt Lake City Public Utilities
- Trades
- General Engineering Contractor GEC
Description
at: Lat: 40.800320, Long: -111.917657, W1500N, Salt Lake City, UT 84116 B. The work to be performed consists of furnishing and installing the equipment, facilities, services, and appurtenances indicated in the Contract Documents. The Work generally includes, but is not limited to, the following: Trenchless installation of six (6) 36” steel casings, four of which will cross under UPRR and UTA railroad corridors, and two of which will cross the UDOT (I-15) right of way and terminate in Rosewood Park. Installation of 24” FRPM carrier pipe for future gravity wastewater utility service, and one (1) 24” FRPM carrier pipe for future storm drain utility service. Installation of three (3) watertight cast-in-place underground structures for wastewater utility service and connections to 24” FRPM pipelines;. Relocation of a 12” water utility within Warm Springs Road. 400 calendar days completion.
Bonds required.
Contact
- Kevin Kranedonk
- (801) 483-6841
- [email protected]
CBS ID: 603819 | Published 10/11/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.