Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#603952 Posted 10/12/2021

Begley Lobby Bathroom Renovation, Schenectady, NY

Owner Reference
RFB-2021-25
Bid Date
Nov 4, 2021 at 02:00pm
Pre-Bid
Encouraged - 10/19/2021 @ 10:00am @ (for location please or )
Owner
County of Schenectady NY

Description

Contractor shall furnish all materials, equipment and labor to make following complete installations: Temporary water as required for work and that is necessary to maintain continuous service to building use and occupants. Schedule “shutdowns” in advance with the Owner. Cutting and patching as required to accomplish the work indicated including painting finish work. Complete hot water, hot water return, tempered water, and cold water distribution systems as indicated on plans for all new plumbing fixtures and equipment. Complete sanitary drainage and vent piping as indicated on plans for all new plumbing fixtures and equipment. Furnishing and installing of plumbing fixtures, equipment and specialties. Insulation and Identification of piping and valves as required by the specifications but not limited to pipe identification and valve identification for all systems. Sleeves and plates including fire stop material. Testing, start-up and balancing of all plumbing installations to include domestic hot water, domestic cold water, and domestic hot water return systems. Balancing work shall include rebalancing of all existing and new domestic hot water systems. Servicing of plumbing equipment installed as required during guarantee period for a minimum of one year after owner’s acceptance. Provide competent factory-trained personnel at site for the purpose of instructing Owner's personnel in proper operation and maintenance of all new plumbing equipment. Preparation and submission of coordination drawings to include coordination with all trades involved in the renovated and new work areas. All work as shown and indicated on plumbing drawings and as specified in Division 22. Plumbing demolition work shall include but not limited to the complete removal of material and equipment from the site. Deadline for questions is October 26, 2021 by 12:00pm. 

Bonds required. Prevailing wages.

Contact

CBS ID: 603952 | Published 10/12/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.