This posting has been archived
Shoreline Consolidation Sewer Project, Cuyahoga Heights, OH
- Owner Reference
- EB-2441
- Bid Date
- Dec 1, 2021 at 01:00pm
- Pre-Bid
- Scheduled - 10/21/2021 @ 10:00am @ (for location please or )
- Estimate
- $51.5M
- Owner
- Northeast Ohio Regional Sewer District
- Trades
- General Engineering Contractor GEC
Description
DBE MBE = 1.3% WBE = 1.0% NEORSD MBE/WBE (MBE + WBE) = 12 % NEORSD SBE SBE = 8 % In general, the work shall consist of furnishing all labor, materials, equipment, and incidentals for construction of the following work: * A 5,100 LF soft ground micro-tunnel parallel to, and north of, the CSX railroad corridor north of Lakeside Avenue from East 40th Street to East 55th Street, where it will connect to the Shoreline Storage Tunnel Shaft SST-3. It will convey wet weather flow diverted from CSO 200. * Internal lining of 2,200 LF of brick sewer ranging in size from No. 2 to No. 10 under St. Clair Avenue and East 33rd Street. * Replacement of flow regulators generally in close proximity to the Easterly Interceptor (Regulators E-18, E-13, E-12, E-09, E-10 and E-01A/E-02A). These regulators are located from East 12th Street to Marquette Street.
Bonds required. Prevailing wages.
Contact
- Steven G. Janosko
- (216) 881-6600
- [email protected]
CBS ID: 604016 | Published 10/12/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.