This posting has been archived
Latourell Road: Latourell Creek Bridge Replacement, Columbia River Gorge, Multnomah Co, OR
- Owner Reference
- ITB-28-2022
- Bid Date
- Nov 16, 2021 at 05:00pm
- Pre-Bid
- Mandatory - 10/21/2021 @ 09:00am @ (for location please or )
- Estimate
- $950,000 - $1,050,000
- Owner
- County of Multnomah OR
Description
Bids will accepted only from bidders who are prequalified by ODOT in the Class or Classes of Work specified in the Special Provisions of the Contract documents. Replacement of Latourell Creek Bridge on Latourell Road. Location: 45°32'19.0"N 122°13'08.5"W, Multnomah County, OR 97019. The project will replace a deteriorated timber bridge with a 24-foot-wide and 38-foot long concrete slab structure.
.
Bonds required. Prevailing wages.
Contact
- Tessa Paul
- (503) 988-7535
- [email protected]
CBS ID: 604161 | Published 10/13/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.