Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#604183 Posted 10/13/2021

2021 Brighton Downtown Main St. Pedestrian and Bike Improvements, Brighton, CO

Owner Reference
21-007042
Bid Date
Nov 12, 2021 at 11:00am
Owner
City Of Brighton CO

Description

The project aims to promote safety along three essential pedestrian crossings on Main Street and encourage active transportation by installing bicycle racks in key downtown locations. The pedestrian crossings have curb extensions reducing the crossing width which will be upgraded to a raised pedestrian crossing with flashing beacons and striping for added safety. An attachment has been added which includes photographs of existing conditions and scope of work. The project shall include:  Mobilization  Concrete Removals  Asphalt Removals  Asphalt Patching  Raised Pedestrian crossing with decorative Concrete  Sidewalk, and Curb & Gutter Installation  Curb Ramps and Detectable Warning Plates  Landscape Restoration  Thermoplastic Pavement Marking  Class VI – Road Base  Bicycle Racks Installation  Traffic Control  Material Testing and Reporting. Questions due 10/27/21. 

Bonds required. Prevailing wages.

Contact

CBS ID: 604183 | Published 10/13/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.