This posting has been archived
Water Reclamation Facility Secondary Clarifier No. 3 Rehabilitation, Pueblo, CO
- Owner Reference
- 21-088 (WWAN04)
- Bid Date
- Nov 2, 2021 at 10:00am
- Pre-Bid
- Mandatory - 10/19/2021 @ 10:00am @ (for location please or )
- Owner
- City Of Pueblo CO
Description
In general, this project will consist of centering the suction manifold around the center column in the secondary clarifier #3 to ensure the proper clearance for the new seal (provided by the City). Contractor shall correct the plumb of the center column, level the suction and balancing arm to ensure true travel of the clarifier, and align the clarifier as specified in the original construction drawing. Additionally, the Contractor shall install stops on the scums arms to get them to stop at the proper spot (allowing the clarifier travel freely) and change the squeegee on the suction manifold arm (squeegee provided by the City). This work will include all administration, labor, materials (except the squeegee and manifold seal provided by the City), tools, equipment, and any accessories or parts that may not be specifically mentioned but are necessary to complete the project. Questions due 10/26/21.
Bonds required.
Contact
- Deborah Rivera
- (719) 553-2350
- [email protected]
CBS ID: 604185 | Published 10/13/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.