Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#604247 Posted 10/14/2021

Replace Fuel Tanks for City Public Works Yard, Fernandina Beach, FL

Owner Reference
22-01
Bid Date
Nov 4, 2021 at 02:00pm
Owner
City of Fernandina Beach FL

Description

Provide 30 day and 48-hour notifications to the FDEP • Provide engineered drawings as required for permitting • Obtain any required permits (City will pay for permit fees) • Disconnect existing electrical to (2) 2,000-gallon vaulted tanks • Remove and dispose of all tank hardware • Clean tanks and properly dispose of all petroleum contact water • Provide necessary equipment for demolition of tanks • Remove and dispose of (2) 2,000-gallon vaulted tanks • Supply and install (1) 5,000-6000-gallon UL-2085, split compartment, double-walled, above ground tank • Tank must be a Modern Welding AST or equivalent • Anchor tank to the concrete slab (if the existing slab is structurally insufficient, the City will reinforce or re-pour the concrete slab) • Install new steel piping to existing suction pumps • All surfaces must be painted with a high-performance coating • Provide and install new Morrison Brothers, or equivalent, mechanical fuel level gauges • Provide and install interstitial sensor gauges • Obtain final permits and completed site cleanup

Bonds required.

Contact

CBS ID: 604247 | Published 10/14/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.