Neptune Apartments Rehabilitation Phase 2, Miami Beach, FL
- Owner Reference
- 2022-067-DF
- Bid Date
- Nov 4, 2021 at 03:00PM
- Pre-Bid
- Scheduled - 10/22/2021 @ 10:00am @ (for location please or )
- Owner
- City of Miami Beach FL
Description
The scope of the construction project is covered within the set of construction documents, and is summarized below: 1. Access and acceptable egress must be maintained to occupied units at all times.
2. Contractor will relocate tenants and personal property to vacant units within the building as needed,
and return them after work within the unit is complete. 3. Remove all existing windows and install new, impact rated windows. 4. Remove and replace existing flooring and replace with new vinyl floor tile, ceramic floor tile and polished concrete as indicated. 5. Repair/replace sub-floors as needed and as indicated.
6. Replace shower pans, showers, bathroom fixtures, bathroom flooring etc. as indicated. 7. Patch and paint walls and ceilings throughout the building interior. 8. Remove all interior lighting fixtures and replace with high efficiency lighting as indicated. 9. Install new high efficiency lighting fixtures where indicated. 10. Replace/repair kitchen cabinets as indicated.
Bonds required. Prevailing wages.
Contact
- Danny Flores
- (305) 673-7490
- [email protected]
CBS ID: 604328 | Published 10/15/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.