This posting has been archived
Construction Management & Inspection Services for West Coast Basin Well 1 Phase 1, Long Beach, CA
- Owner Reference
- O-0745
- Bid Date
- Nov 9, 2021 at 03:00pm
- Pre-Bid
- Scheduled - 10/19/2021 @ 09:00am @ (for location please or )
- Estimate
- $876,200 (Construction Cost Estimate)
- Owner
- City of Long Beach Water Commissioners CA
Description
Consulting services shall include reviewing existing plans; evaluating existing facilities and site modifications; providing construction management, resident engineering, and inspection services. LBWD would like to maximize its allocated annual pumping rights in both Central and West Coast Basins by expanding its groundwater production program. Originally constructed in 2017, the West Coast Basin Well 1 (WCB1) is currently in non-operation, but LBWD plans to use this well for water production. LBWD would like to construct a pump-to-waste system for WCB1 for water sampling and to determine types of future water treatment system needed prior to its conveyance into the distribution system.
Bonds required. Prevailing wages.
Contact
- (562) 570-2327
- (562) 492-9631
CBS ID: 604498 | Published 10/17/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.