This posting has been archived
Tolt Pipeline No. 1 Rehabilitation, Seattle, WA
- Owner Reference
- 2021-048
- Bid Date
- Nov 3, 2021 at 02:00pm
- Pre-Bid
- Mandatory - 10/25/2021 @ 10:00am @ (for location please or )
- Owner
- City of Seattle WA
Description
This Project consists of the following elements of Work: rehabilitation of approximately 2,500 linear feet of the Tolt Pipeline No. 1 using 54-inch HDPE pipe installed by slip-lining, making connections to existing 66-inch pipeline, installing blowoff valves and chambers, installing access port and air release chamber, erosion control, traffic control, surface removals and restoration. This Project is located in unincorporated King County southeast of Duvall, WA 98019. The work is along a portion of the Tolt Pipeline Access Road (Note: it is unnamed in Google Maps) which is a private Seattle Public Utilities road that is located approximately 1 mile northwest from the Tolt Regulating Basin and 4 miles east from the Kelly Road SPU Access Gate (12760 Kelly Rd NE, Duvall, WA). This project location is not open to the public.
Bonds required. Prevailing wages.
Contact
- (206) 684-8032
- [email protected]
CBS ID: 604638 | Published 10/18/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.