Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#604650 Posted 10/18/2021

LA Cima Conservation Camp HVAC Replacements, Julian, CA

Owner Reference
3CA05593
Bid Date
Nov 9, 2021 at 01:00pm
Pre-Bid
Mandatory - 10/25/2021 @ 11:00am @ (for location please or )
Owner
Cal Fire HQ

Description

Contractor shall provide all material, labor, equipment, tools, permits, taxes, fees, and all other services necessary, to replace existing HVAC systems for a kitchen and dormitory, located at CAL FIRE’s La Cima Conservation Camp. Contract shall: - Add two (2) Gree R410A Outdoor Condensers, two (2) Gree Indoor R410A Cassette units in the kitchen dining area (or CAL FIRE approved equal) and provide and install new digital programmable thermostats. - Add one (1) Side Discharge Evaporative cooler to serve the La Cima Kitchen food prep area. - Remove and dispose of existing package units; provide and install two (2) new, five (5) ton, Packaged Heat Pumps to serve the dormitory building, adaptation to existing duct connections, electrical connections, and controls with condensation drain to existing location; provide and install new digital programmable thermostats. - Generally required - Provide and install copper line sets, control wires, condensation drain lines and connection of high voltage wiring, vacuum pumping to 500 microns to check for leaks and remove contaminants from refrigeration lines, adaptation to condensation drain lines and connect condensate pumps. - Related to Evaporative Cooler: Make final connection to high voltage wiring supplied by CAL FIRE, install copper valve and copper water supply lines from nearby water supplied by CAL FIRE, provide and make ductwork and flashings from the exterior to interior. - Kitchen Exhaust Fan - Provide and install custom side discharge curb, raise/extend exhaust fan exhaust to appropriate height and install CAL FIRE provided exhaust fan, custom design build of exhaust fan side discharge counter flashing, proper start up, and commissioning when complete.  Questions due 11/2/21. Term is through 6/30/22. DBE incentives. 

Bonds required. Prevailing wages.

Contact

CBS ID: 604650 | Published 10/18/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.