This posting has been archived
Salton Sea Dust Suppression Projects, Imperial County, CA
- Owner Reference
- 10176440
- Bid Date
- Nov 3, 2021 at 03:00pm
- Owner
- State of California Department Of Water Resources CA
Description
Transport and placement of 170,000 grass bales, enhancement of vegetation, and creation of imprinted seed beds at projects identified in the Vegetation Enhancement Project Descriptions and Maps Document (Exhibit A, Attachment 2). All work provided by the Contractor will be performed on an as-needed basis and always at the direction of DWR. The Contractor will be familiar with and follow all federal, state and local regulatory requirements in order to construct projects. DWR will provide biological, environmental, and archeological/paleo monitoring and plans necessary to meet such regulatory requirements. The Contractor will be responsible for preparing and submitting a Construction Dust Control Plan to Imperial County Air Pollution Control District (ICAPCD). The Contractor will construct the projects as shown and described in the Construction Plan Set (Exhibit A, Attachment 3). The Contractor will be familiar with and use Trimble or Topcon construction GPS equipment, or similar, for building the projects as specified. DWR will provide the Contractor with either point files, Digital Elevation Models, or whichever point formats the Contractor prefers. Questions due 10/25/21. DBE incentives.
Bonds required. Prevailing wages.
Contact
- Nicole Anderson
- (916) 653-5791
- [email protected]
CBS ID: 604653 | Published 10/18/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.